The benchwork extra foot is done and installed. It took nearly as much work as the original 5X10. So much for afterthoughts . . .
I am getting ready to lay out the track plan and glue down woodland scenics roadbed. Also need to build a wooden jig or 2 to bend the Gargraves (a strong recommendation from what I read). I am still not sure how well this is going to work on top of 2” of foam since I can’t screw down the track. Straights will be fine. For the curves, I am hoping that if I pre-bend the track and weight and glue it, it will be ok. I will try a section, and if it fails miserably, I will pull off the foam and maybe add another 1/8” underlayment and put the roadbed and track on that. I’ll have to give up on most of the below grade scenery, but I’ll cope. To be honest, a lot of things will be easier if I pull the foam off, but I have a pathological tendency to avoid doing things the easy way.
No comments:
Post a Comment